Home  /  New Construction
AZ ROC #358250  ·  Tucson, Arizona

New
Construction.

Full-package electrical for new homes — temporary power through final trim-out. We wire new builds and custom homes for Tucson homeowners and builders, permitted and inspected start to finish.

Builder-Ready Electrical

From temp power to the last fixture.

A new build's electrical is a sequence, not a single job — temporary power for the trades, then the service and panel, then a complete rough-in, and finally trim-out once the walls and finishes are in. We run that whole sequence so nothing falls between phases and every inspection signs off on schedule.

We work directly with homeowners building custom and with general contractors, scheduling our rough-in and trim-out around the rest of the build. Every circuit is sized for how the home will actually be used, and we plan ahead for the things owners add later — EV chargers, a future panel for a casita or shop, dedicated circuits for appliances and HVAC.

Because this is bigger work, we use milestone-based payments (30/40/30) tied to real job stages — deposit, rough-in, and final — so you only pay as the work is completed and inspected.

What's Included

A complete new-build package covers

From the temp pole to the final walkthrough, the full scope:

The Build Sequence

How a new build comes together

01

Temp Power

We set the temporary power pole so framing and the other trades can work from day one.

02

Service & Panel

Meter base, service entrance, and a 200A panel sized for the finished home and its future loads.

03

Rough-In

All circuits run and boxes set before insulation and drywall, staged for a clean inspection.

04

Trim-Out

Devices, fixtures, fans, and final labeling — then the inspection and your walkthrough.

Good to Know

Frequently asked questions

Do you work with general contractors and builders?

Yes. A large share of our new-construction work is alongside GCs and custom-home builders. We coordinate our rough-in and trim-out around framing, insulation, drywall, and the other trades so the schedule holds and inspections pass cleanly.

How do payments work on a new build?

Larger jobs use milestone-based payments — typically 30% deposit, 40% at rough-in, and 30% at final. You only pay as each stage is completed and inspected, so the cost tracks the actual progress of the work.

Can you wire a custom home for future EV charging or a casita?

Absolutely, and it's far cheaper to plan for it during construction. We size the panel and pre-wire for EV chargers, future subpanels for a shop or casita, and dedicated circuits while the walls are still open.

Do you handle all the permits and inspections?

Yes. We pull every electrical permit and coordinate each inspection — temp power, rough-in, and final — with the City of Tucson, Pima County, or the relevant town. You and your builder never have to manage the electrical sign-offs.

Explore More

Related services & areas

Building new in Tucson?

Share your plans or square footage and we'll scope the full electrical package and send a written quote — milestone payments tied to real job stages.

Get a Free Quote Call 520-633-3746